Mon-Fri, 7:00 AM-4:00 PMCall Big Bend Services(850) 819-6031

Blower door testing

New Construction Blower Door Testing in the Florida Panhandle

Blower door tests on new homes for builders, superintendents and owner-builders across the Florida Panhandle.

Hallway of a newly finished house

Booking the test as a step in the build

The test is tied to the stage the house has reached, not to a date on the calendar, so booking starts from when the house will be ready.

Call (850) 819-6031, Monday to Friday from 7:00 AM to 4:00 PM, or send the form with the address, the permit number and the ready date.

Blower door fan sealed into the front doorway of a new house, seen from outside

When to book

The stage the house needs to reach

The code allows the test any time after every opening through the shell has been made. Book it once the last pipe, wire, vent and duct through the outer walls and ceiling is in.

  • Plumbing

    Drain and vent pipes through the floor, walls and roof, and supply lines to outside hose bibs.

  • Electrical

    Wiring to outside lights and outlets, the service entrance, and boxes set in exterior walls and ceilings.

  • Heating and cooling

    Duct runs into the attic, the supply and return boots cut into ceilings and floors, the refrigerant lines to the outdoor unit, and the condensate line.

  • Gas lines and flues

    A gas line, or a flue for a water heater or fireplace, passing through a wall or the roof.

  • Fans and vents

    Bath and kitchen exhaust fans, the dryer vent and any fresh air intake.

  • Ceiling fixtures

    Recessed lights and electrical boxes cut into ceilings below the attic, in place with their housings.

  • Raised floors

    Pipes and ducts through the subfloor on a house built over a crawl space.

  • Attic access

    The attic hatch or pull-down stair installed in its frame.

  • Windows and exterior doors

    All of them hung and able to latch, since the test is run with them closed.

Blower door fan in a red frame across an interior doorway with a gauge on a tripod beside it

Booking ahead leaves time for a retest

If the test is the last thing on the schedule, a high reading holds up the end of the job while leaks are corrected and the house is tested again. Booking ahead of your last steps leaves time for that without pushing back the finish.

Finishes do not change the reading. Paint, flooring, trim, cabinets and countertops can still be going in on test day, so the test can sit earlier in the schedule than the final clean. If the ready date slips, call and a new test date is set. A retest also needs the house set up in the test conditions again.

Blower door fan set up in a hallway doorway of a new home

Booking

What to send when you book

For a group of houses, a list with one line per house is enough.

  • The address

    Where the house is, with the lot number if a street address has not been assigned yet.

  • The permit number

    The building permit for that house.

  • The ready date

    When the last opening through the shell will be made.

  • Who to call on site

    The superintendent, or whoever handles access to the house.

New single-story house with the outside finished and the yard not yet landscaped

Builders and owner-builders

Several houses, custom homes and owner-built houses

  • Several houses

    Each one is tested on its own and gets its own result, so one house reading high does not change the result of the next.

  • Different ready dates

    If the houses will be ready on different days, the test dates follow the houses.

  • Spec houses and models

    A spec house or a model home is booked like any other, with its own ready date, whether or not it has sold.

  • Owner-builders

    An owner building their own house sends the same details a builder does.

Empty kitchen of a newly built house

Telling the trades about the test date

Put the test on the schedule the trades see. A trade that plans to cut a late opening through the shell for a line or a vent needs to do it before the test, not after, or the reading will not include it.

On the day, the heating and cooling stays off and the exterior doors and windows stay shut while the fan runs. Crews working inside should know that before they arrive, and one exterior doorway should be kept clear of materials for the fan and its frame.

Blower door fan set in a red panel across the front doorway of a new house
Newly built single-story home with fresh sod and a new driveway

Where we work

Counties where we test new homes

New construction testing is available in each of these counties.

Blower door fan sealing the front door of a new house, seen at an angle

What to expect

What happens on test day and after

  1. 1

    Set-up

    The house is checked against the test-day list, and a fan is fitted in an exterior doorway.

  2. 2

    Test run

    The fan holds the house at the test pressure while the air leakage is measured.

  3. 3

    Result

    You get the reading for that house.

  4. 4

    If it is over

    The leaks are corrected, and the house is tested again under the same conditions.

Get a Quote

Blower door fan in a red panel beside a doorway with a gauge on a tripod

FAQ

New construction blower door questions

Have another question? Call (850) 819-6031.

Can the test be done before the drywall is up?
Yes. The reading measures the shell as it stands that day, so any gap the drywall and ceiling would close is counted as a leak while it is still open. Booking once the ceiling drywall is up measures the house closer to how it will be finished.
Does the attic insulation need to be finished first?
On a plan with the attic sealed and insulated at the roof deck, yes. That attic is measured with the house, so the roof deck sealing and insulation are part of what the fan is testing.
Does the door from the garage into the house need to be hung?
Yes. With an unheated, uncooled attached garage, the wall and that door are part of the boundary being measured, so the door has to be in place and closed.
Can one call book houses in different counties?
Yes. Tests are booked from our Wewahitchka office for all nine counties we serve, so houses in different counties can go on the same call.
What do we get after the test?
The reading for that house, in air changes per hour at 50 pascals, which shows whether it is at or under the limit of 7.

Get a quote

Request a New Construction Blower Door Test

Send the address, permit number and ready date for each house, and the office will follow up.

(850) 819-6031

511 S Highway 71, Wewahitchka, FL 32465
Monday to Friday, 7:00 AM to 4:00 PM

Newly built two-story home with fresh sod and a new driveway

Your information is used to respond to this request. See our Privacy Policy.