Planning the blower door test on a new Altha house around the date you need it finished.

Blower door fan set in a red panel across the front doorway of a new house

Scheduling a blower door test in Altha

Big Bend Services, Inc. tests newly built houses in Altha, ZIP code 32421, for air leakage under the Florida energy code. When the test is booked decides how much room is left between the reading and the date the house has to be finished.

Call (850) 819-6031, Monday to Friday, 7:00 AM to 4:00 PM, or send the form. Our office is in Wewahitchka.

Blower door fan sealed into the front doorway of a new house, seen from outside

Work back from the finish

Picking a test date for an Altha house

Two dates frame the test: the ready date, when the last opening through the shell is made, and the finish date, when the house has to be done for a move-in, a sale or a closing.

  • Close to the ready date

    An early test leaves the most room behind it.

  • Room for a retest

    A house over the limit has its leaks corrected and is tested again, and both need to fit before the finish date.

  • Finishes alongside

    Paint, floors, trim and cabinets do not change the reading, so they can go on around the test.

  • Trades on the schedule

    Put the test date where every trade with work crossing the shell can see it, since an opening made after the test is not part of the reading.

New single-story house with the outside finished and the yard not yet landscaped

Readiness

What holds up the ready date

Each of these crosses the shell, and the ready date is only as firm as the last one to go in.

  • Windows and exterior doors

    Installed and able to close and latch.

  • The attic access

    The hatch or pull-down stair set in its frame.

  • Fans and vents

    Bath fans, the range hood duct and the dryer vent, each with its outside cap.

  • Refrigerant and condensate lines

    Run through the wall to the outdoor unit.

  • Plumbing and electrical outside

    Hose bibs, outdoor outlets and lights, and the service entrance.

  • Gas lines and flues

    Any gas line through a wall and any flue through the roof for a water heater or fireplace.

  • Fresh air intake

    The duct and outside hood, if the plan has one.

Blower door fan in a red frame across an interior doorway with a gauge on a tripod beside it

When the Altha ready date changes

Call the office as soon as the ready date changes, and a new test date is set. The same call covers a change to the person who will open the house, or a test-day condition that cannot be met, such as a damper that has not been installed yet. For a group of houses, only the house whose date moved gets a new one, and each of the others keeps the date it has.

Blower door fan set up in a hallway doorway of a new home

The limit

The number an Altha house has to meet

Section R402.4.1.2 of the 2023 Florida Building Code, Energy Conservation, sets the limit for new houses in Climate Zones 1 and 2 at 7 air changes per hour at 50 pascals. Table R301.1 places Calhoun County in Climate Zone 2.

  • 7 air changes per hour

    At the test pressure, the leaks may swap the air inside for outside air no more than seven times in an hour.

  • One zone for every county

    Every county we serve is in Climate Zone 2, so a house in Altha meets the same limit as a house on the coast.

  • At or under

    A reading of 7 or below is within the limit.

Hallway of a newly finished house

How the reading is taken

A fan is fitted in an exterior doorway, in a frame and panel that close off the rest of the opening. It holds the house at the test pressure, and the air it has to move to do that is the leakage. The result is one number for the whole shell, which shows how much air gets through but not where, so the house is measured as a whole each time it is tested.

Blower door fan in a red panel beside a doorway with a gauge on a tripod

Booking

What to send when you book an Altha test

The office sets a date from four details, sent by phone or through the form.

  • Address

    The street address of the house.

  • Permit number

    The building permit for the house.

  • Ready date

    The ready date you have worked out.

  • Site contact

    A name and number for the person who opens the house, and any gate code or lockbox.

  • More than one house

    One line per house with its own details, and each is tested on its own.

Newly built single-story home with fresh sod and a new driveway

The boundary

The attic and garage in an Altha test

How the attic is built and whether the garage is attached decide where the measured shell runs.

  • Vented attic

    Outside the test. The ceiling below it is the boundary.

  • Attic sealed at the roof deck

    Opened to the house for the test and measured with it.

  • Attached garage

    Outside the test when it is not heated or cooled, with the wall and door into the living area measured as part of the boundary.

  • A room over the garage

    When it is heated and cooled and the garage is not, the floor between them is part of the boundary.

  • A sunroom

    Inside the shell when it is heated and cooled with the house.

Empty garage of a newly built house with a white door and a water heater

Crews at an Altha house on test day

Trades can keep working at an Altha house on test day as long as the house stays in the test-day set-up and no one walks through the doorway the fan is fitted in. Noise, dust and work at the next lot have no effect on the reading. The person opening the house can pass that on to the crews that morning.

Blower door fan sealing the front door of a new house, seen at an angle

Scope

What an Altha reading does not cover

The fan measures air leakage through the shell and nothing else.

  • Insulation

    How much insulation is in the walls and attic is set elsewhere in the energy code.

  • Windows

    Window energy ratings are not part of the reading.

  • Equipment

    The heating and cooling system is not rated by the test.

Empty living room of a newly finished house

Placing the first test in the build

A first test before drywall leaves the top plates and the wire and pipe openings through them in view if the house has to be corrected, and the same is true before insulation is blown onto the floor of a vented attic. After the cabinets and trim are in, any corrections happen around finished surfaces. The builder chooses which point suits the build.

Hallway of a new house with an attic access hatch in the ceiling

Test day

How an Altha house is left for the test

The code sets the conditions for the time the test runs.

  • Outside

    Exterior windows and doors closed, but not sealed.

  • Fireplace and stove

    Their doors closed.

  • Dampers

    Exhaust, intake and flue dampers closed.

  • Inside

    Interior doors open where they are installed.

  • Equipment and registers

    Heating and cooling off, with supply and return registers fully open.

Newly built white farmhouse-style home with a metal porch roof and fresh sod
Empty laundry room with washer hookups in a newly finished house

Same county

Blower door tests in other Calhoun County towns

Empty bedroom of a newly finished house

What to expect

How an Altha test is booked

  1. 1

    Send the build details

    Address, permit number and when the house will be ready.

  2. 2

    Test booked

    We give you a date for the test.

  3. 3

    Test run

    The house is tested once it is ready.

  4. 4

    After a failed test

    Corrections are made and the house is tested again.

Get a Quote

Empty kitchen of a newly built house

FAQ

Altha blower door questions

Have another question? Call (850) 819-6031.

Should the test wait until the driveway and yard are done?
No. Driveways, walks, landscaping and fences are outside the house and have nothing to do with the shell.
Why is the test run at 50 pascals?
50 pascals is the pressure the code names, equal to 0.2 inches of water gauge, so every house is measured under the same push. It is strong enough to swamp the small pressures wind and indoor warmth put on a house.
Can the test be booked while the windows are still on order?
Yes, as long as you can give a ready date.
Is the limit different in winter or summer?
No. The code sets one limit whatever the season.
How does a reading turn into airflow?
A house with 20,000 cubic feet inside its shell reading 7 is leaking about 2,333 cubic feet a minute at the test pressure: 20,000 times 7, divided by 60. The same house reading 9 would be leaking about 3,000.
Does a detached garage or shed count?
No. A building that stands apart from the house shares no wall with it and is not part of the test.

Get a quote

Request a Blower Door Test in Altha

Use the form to book a test on a new Altha house, and the office will follow up.

(850) 819-6031

511 S Highway 71, Wewahitchka, FL 32465
Monday to Friday, 7:00 AM to 4:00 PM

Newly built two-story home with fresh sod and a new driveway

Your information is used to respond to this request. See our Privacy Policy.