Esto, Holmes County

Blower Door Testing in Esto, Florida

The air leakage test for new houses in Esto, timed to the shell rather than to the finishes.

Blower door fan set in a red panel across the front doorway of a new house

Blower door tests for new houses in Esto

Big Bend Services, Inc. runs the Florida energy code air leakage test on newly built houses in Esto, ZIP code 32425.

Call (850) 819-6031 on a weekday from 7:00 AM to 4:00 PM, or send the form with the address, permit number, ready date and site contact.

Newly built single-story home with fresh sod and a new driveway

Finishes

What can still be unfinished on test day

Section R402.4.1.2 of the Florida Building Code, Energy Conservation, 8th Edition (2023), lets the test run any time after every penetration of the shell has been made. Work that adds no new opening can be under way.

  • Interior paint

    Primed, half painted or bare, the walls and ceilings read the same.

  • Floors

    Carpet, tile, wood or vinyl are laid on top of the slab or subfloor and do not affect the leakage.

  • Trim

    Baseboards, casings and crown molding can go on after the test or while it is being booked.

  • Cabinets and countertops

    Kitchen and bath cabinets and their tops can be set before or after the test.

  • Appliances

    The refrigerator, dishwasher and washer can arrive after the test.

  • Work outside

    Driveways, sod and fences are outside the house and have no bearing on the reading.

Blower door fan sealed into the front doorway of a new house, seen from outside

Must be in

What has to be done before the test

  • Windows and exterior doors

    All installed, since an empty rough opening leaves the wall open to the outside.

  • Plumbing and gas

    Every vent through the roof and every line through a wall or floor.

  • Electrical

    The service entry and every wire run up through the top plates into the attic.

  • Heating and cooling

    Refrigerant lines, the condensate drain, ceiling duct boots and any fresh air intake.

  • Exhaust

    Bath fans and the dryer vent run to the outside.

Blower door fan sealing the front door of a new house, seen at an angle

Looks like a finish

Late work that is really an opening

Some work arrives near the end of a build but still cuts through the shell, so it goes in before the test.

  • Range hood duct

    The hood may go up with the cabinets, but if it vents outside, its duct passes through a wall or the roof.

  • Outdoor lights and outlets

    Each fixture box on an outside wall, including porch lights and a doorbell, is an opening until it is set and closed.

  • Cameras and cable

    Wires for security cameras, satellite or internet that are pulled through an outside wall late in the job.

  • A pet door

    A pet door cut into an exterior door or wall is a permanent opening.

  • A whole-house fan

    A fan that exhausts into the attic sits in a large opening in the ceiling.

  • An attic stair added late

    A pull-down stair put in for attic storage cuts a new opening in the ceiling.

  • Hose bibs and outdoor gas

    A spigot or a grill line added after the walls are closed makes a new opening through them.

Blower door fan in a red frame across an interior doorway with a gauge on a tripod beside it

Seals

Seals that go on near the end but still count

Weatherstripping can look like trim work, but it closes gaps in the shell, so it belongs in place before the test.

  • Exterior door weatherstripping

    Along the sides and top of each outside door.

  • Door sweeps and thresholds

    The seal along the bottom of each outside door.

  • Sliding door seals

    Where the moving panel of a sliding door meets its frame.

  • Attic hatch weatherstripping

    Around the frame of the hatch or pull-down stair, with a latch or weight that holds it down.

  • The door from the garage

    Its weatherstripping and bottom seal, the same as a front door.

Empty garage of a newly built house with a white door and a water heater

Before they are covered

Gaps the finishes will hide

Some finish work covers places where the shell can leak. Looking at these before the finish crews arrive keeps them reachable if the reading comes back high.

  • Behind the tub

    A tub or shower set against an outside wall closes off that stretch of wall and the drain opening under it.

  • Behind the kitchen cabinets

    Pipes and wires coming through an outside wall behind the sink and range base are hidden once the cabinets are set.

  • Around windows and doors

    The gap between each frame and its rough opening disappears under the casing.

  • Soffits over cabinets

    A boxed soffit above the upper cabinets can open into the attic, and it is closed in once the cabinets and trim are up.

Empty kitchen of a newly built house

Scheduling

Booking the test ahead of the finish work

A test set for the day the shell is complete, instead of the week before move-in, leaves time on the schedule to correct leaks and test again if the reading is high.

  • Book from the expected date

    Call once you know roughly when the last opening will be made, and we give you a date for the test.

  • Dates that slip

    If the house will not be ready on the booked date, call the office and a new test date is set.

Blower door fan in a red panel beside a doorway with a gauge on a tripod

Test day

How the house is left for the test

  • Windows and exterior doors

    Closed, but not sealed.

  • Fireplace and stove

    Doors closed.

  • Dampers

    Exhaust, intake and flue dampers closed.

  • Interior doors

    Open where they are installed.

  • Heating and cooling

    Off.

  • Registers

    Supply and return registers fully open.

Blower door fan set up in a hallway doorway of a new home

The limit and how it is measured

Esto is in Holmes County, which is in Climate Zone 2. The limit there is 7 air changes per hour at 50 pascals. A fan fitted in an exterior doorway holds the house at that pressure while the leakage is measured, and you get the reading for the house. A house over the limit has its leaks corrected and is tested again.

Newly built white farmhouse-style home with a metal porch roof and fresh sod

Booking

Booking an Esto test

Tests are booked through our office at 511 S Highway 71 in Wewahitchka. If the plan has an attic sealed at the roof deck or a garage with its own heating or cooling, put that on the booking, because it moves the edge of what gets measured.

New single-story house with the outside finished and the yard not yet landscaped
Newly built two-story home with fresh sod and a new driveway

Same county

Blower door tests in other towns in this county

Newly built stucco home with a white garage door and a new concrete driveway

What to expect

How an Esto test is set up

  1. 1

    Send the build details

    Address, permit number and when the house will be ready.

  2. 2

    Test booked

    We give you a date for the test.

  3. 3

    Test run

    The house is tested once it is ready.

  4. 4

    After a failed test

    Corrections are made and the house is tested again.

Get a Quote

Empty living room of a newly finished house

FAQ

Esto finish and scheduling questions

Have another question? Call (850) 819-6031.

Does the water heater need to be installed?
Only its vent matters, if it has one through the roof or a wall. That opening needs to be made before the test. An electric water heater with no vent has no effect, and a tank that is set but not yet hooked up is fine.
Should screens be on the windows?
Screens make no difference either way. They sit outside the sash, let air straight through and seal nothing, so they can go on before or after the test.
Does the attached garage need to be finished?
An unheated, uncooled garage is outside the test, so its floor coating, shelving and paint can wait. The wall and door between it and the house do need to be complete, because they are part of the boundary.
Do the light fixtures need to be hung?
Fixtures inside the house are finish work. What has to be done is any ceiling or wall opening they sit in, such as a recessed can set into the ceiling below the attic, and the gap around it.
What does 50 pascals mean for the reading?
It equals 0.2 inches of water column. The airflow at that pressure, over an hour and divided by the house volume, gives the figure: an 18,000 cubic foot house reaches 7 at 2,100 cubic feet per minute.

Get a quote

Request a Blower Door Test in Esto

Use the form for a new Esto house, even with finishes still going in, and the office will follow up about the date.

(850) 819-6031

511 S Highway 71, Wewahitchka, FL 32465
Monday to Friday, 7:00 AM to 4:00 PM

Hallway of a new house with an attic access hatch in the ceiling